请帮忙翻译--采用后再送300。谢过!

发布网友 发布时间:2022-04-24 07:15

我来回答

5个回答

热心网友 时间:2022-06-17 09:17

配比机服务、培训及违约责任
Service, Training and Liabilities for Breach of Contract
with Regard to the Contractual Automatic Mixing & Pumping Unit
一、服务
Section 1. Service
1 售前服务:
1. Pre-sale Service
The following pre-sale service shall be provided:
1.1帮助用户进行前期配比机设计、选型;
1.1Help perform the prophase design and type selection of the automatic mixing & pumping unit for the customer.
1.2根据用户的产品要求,帮助用户进行配比机选型及相关辅助零部件选型;
1.2 Help select the appropriate model of the automatic mixing & pumping unit, its components and accessories for the customer in accordance with the specific proct requirements of the customer.
1.3根据用户的产品要求,帮助用户定制相关操作规程;
1.3 Help prepare relevant operational proceres for the customer in accordance with the specific proct requirements of the customer.
2 售后服务
2 After-sale Service
2.1售后服务部24小时电话接待,24小时待命;接到需方的报修后,在1小时内给予答复。
2.1 The after-sale service call is reachable for 24 hours and the service personnel available around the clock. The after-sale service department will respond to any service request within one hour.
2.2供方在接到报修后24小时内赶到现场。
2.2 The Seller’s service personnel will arrive to the job site within 24 hours upon request.
2.3质保期内,在正当使用的情况下,如发生故障,供方负责免费提供零件及修理服务。如需方使用不当造成的机械、电气等部分故障,供方仍负责维修,但以优惠价收取相应的报酬。
2.3 The Seller shall provide charge-free parts and services for any failures or defects of the contractual proct in normal operation condition within the warranty period. The Seller will provide parts and services at the expense of the Buyer if the mechanical or electrical failure of the contractual proct is caused by improper operation or misuse by the Buyer.
2.4质保期外或需方使用不当造成的机械、电气等部分故障,供方仍负责维修,但以优惠价收取相应的报酬。
2.4 The Seller shall continue to provide aforementioned services to help remove mechanical or electrical failures for the Buyer after the warranty period is expired or such failures are caused by equipment misuse by the Buyer. The service cost in such cases shall be covered by the Buyer.
2.5帮助用户解决配比机使用中一切难题。
2.5 Help the customer to solve any problems with the operation of the automatic mixing & pumping unit

二、培训
Section 2 Training
1、现场培训:在设备安装、调试过程中,对技术人员、操作工人进行设备现场培训。
1. Site training: The Seller shall provide site equipment training for the technical and operational personnel from the Buyer in the process of equipment installation and commissioning.
2、供方为需方提供配比机设备操作、维护保养说明书。
2. The Seller shall provide the Buyer with operation and maintenance manual for the contractual automatic mixing & pumping unit

三、违约责任:
Section 3 Breach of Contract
1、供方的违约责任:
1. The Seller’s liability for breach of contract
1)供方如不能按合同约定的期限交货超过7天以上,则每超过一天,按该机金额的1‰承担违约金,以此类推。延期交货时间超过14天以上时,则每超过一天按合同总价的2‰承担违约金。如因需方原因造成工期延误,则与供方无关。
1) If the Seller fails to deliver the contractual goods according to the date as specified in the Contract, it shall pay penalty for the delay if the delay exceeds 7 days. The penalty rate is 1‰ of the total contractual proct price per day. If the delay exceeds 14 days, the penalty rate is 2‰ of the total contractual proct price per day. If the delay is e to the Buyer’s fault, the Seller shall not pay such penalty.
2)供方实际采购或制造中出现不符合技术规格书中承诺的条件时,供方应事先主动出具书面报告并征得需方同意后实施,在供方未事先告知需方的情况下,当需方发现实际情况与供方技术规格书中所承诺的内容不一致时,需方有权向供方提出,并按该零部件实际价格的三倍对供方实施扣款,供方必须无条件接受并立即改进。对于不可见部分材料的使用,要求供方在使用前事先告知需方,以便需方有时间亲临施工现场,实地鉴定供方使用的材料,需方接到供方通知后,如未在规定的可以达到的时间内到达供方,则与供方无关。如没有通知需方,则生产不能进行。进行部分应返工处理。
2) For items not in compliance with the contractual technical specifications in the process of material purchase and proct manufacturing by the Seller, the Seller shall notify the Buyer of such nonconformity in writing and in advance for consent of the Buyer before proceeding to adopt the items. If the Buyer finds any items noncompliant with the contractual technical specifications and the Seller fails to notify the Buyer of such noncompliance in advance, the Buyer is entitled to demand an compensation and immediate corrections and the Seller shall accept the Buyer’s claim unconditionally. The Buyer will dect the amount of the noncompliant item from the total payment at the rate of three times of the original item price. For the use of concealed material, the Seller shall inform the Buyer in advance so that the Buyer can send its technical personnel to the job site to test the material and/or witness the use of the material. If the Buyer fails to arrive at the job site for the inspection within the specified time, the Seller may continue its operation without bearing any responsibilities; the Seller shall not start any operation concerning the concealed material application without informing the Buyer in advance. Should any work be done without e authorization, rework is required.
3)需方如发现供方未能按本合同及技术协议约定的产品规格型号、器材配置、生产厂家进行提供,需方有权要求供方进行及时调换。如该部件的使用造成机器故障并使需方停产,供方同时应按需更换零部件价格的1倍赔偿需方,如不能更换,则按该产品或该部件价格的3倍赔偿需方。(因供方产品的不断改进及零部件
3) If the Seller fails to provide the Buyer with the proct in compliace with the model, technical specification, configuration and manufacturer as specified in this contract and relevant technical agreements, the Buyer is entitled to demand a recall of the noncompliant items by the Seller. The Seller shall be held liable for any equipment troubles and shutdown resulted from use of the noncompliant parts and compensate for the loss at the rate of twice the price of the noncompliant parts. If the Seller is unable to replace the noncompliant parts, it shall pay for the loss caused thereof. The compensation rate in this case shall be three times of the noncompliant parts or proct. (considering the continuous improvement of the Seller’s proct and component……没有下文了?)
4)质保期内,如供方不能按照约定的接到需方设备故障通知后,最迟在24小时内到达需方服务的承诺,则每延长1小时,供方应赔偿需方100元/小时的损失,超过32小时以上时,供方应承担需方1000元/小时的停产损失。
4)If the Seller fails to meet its commitment that the Seller shall provide timely service to the Buyer within 24 hours upon receiving the equipment failure notification from the Buyer within the warranty period, as stipulated in the contract, the Seller shall make compensation for the loss caused thereof, at a rate of RMB100 per hour delay. If the delay exceeds 32 hours, the compensation rate shall be RMB1000 per hour delay.
5)质保期内,如果因供方设备质量原因造成需方停产在7天以上,供方应承担需方1,000元/天的停产损失,停产在14天以上时,供方除应承担需方2000元/天的停产损失。如遇到供方产品无法修复的重大质量缺陷,需方有权要求退货并赔偿因此而造成的直接损失。
5) If the quality-related equipment failure occurs within the warranty period and such failure has resulted in the proction suspension of the Buyer for more than 7 days, the Seller shall make compensation for the proction losses of the Buyer at the rate of RMB1,000 per day. If the proction suspension exceeds 14 days, the compensation rate shall be RMB2,000 per day. If the Seller’s proct has major quality defects that cannot be removed or repaired, the Buyer is entitled to reject the goods and claim against the direct loss caused thereof.
2、需方的违约责任
2. The Buyer’s liability for breach of contract
1)需方在向供方发出订单并支付货款后,如取消订单订购的产品,需方无权要求供方返还已付货款。
1) The Buyer shall not cancel the proct order after it places the order and make payment for the goods. If the Buyer cancel the order without agreement from the Seller, it shall not demand the return of the amount already paid for the contractual goods.
2)需方在向供方发出订单后,如不能按合同约定的期限和金额支付款项,供方有权顺延本合同交货期。
2) If the Buyer, after placing the purchase order, is unable to make timely payment for the contractual goods in accordance with the date and amount as specified in the contract, the Seller may postpone the contractual delivery date.
3)双方发生合同纠纷协商解决不成时,双方均可向所在地人民*起诉。
3) Any disputes arising from or in connection with the performance of this contract should be solved through friendly negotiation. If the negation fails, either party hereto may bring the case to the local people’s court.
4)技术协议书经双方签字盖章后与本合同同时生效,具有相同法律效力。
4) The technical agreement shall come into force simultaneously with this contract upon signature and seal of both parties. The technical agreement and this contract have equal legal effect.
5)技术服务和售后服务按供方提供的服务、培训及违约责任执行,具有与合同相同的法律效力。
5) The technical service and after-sale service shall be performed in accordance with the Service, Training and Liabilities for Breach of Contract herein provided by the Seller. This text and the contract have equal legal effect.
6)本合同经双方签字盖章后生效,双方各执两份,具有相同法律效力。
6) This contract shall come into force upon signature and seal of both parties. This contract is made in four original copies, each party holding two copies. All the copies have equal legal effect.

热心网友 时间:2022-06-17 09:17

Proportion of services, training and liability for breach of contract
A service
1 pre-sale services:
1.1 helps users ratio for the front-end design, selection;
1.2 procts according to the user's request, to help users ratio of Selection and related ancillary components Selection;
1.3 procts according to the user's request, to help the user to customize the relevant rules;
2 Service
2.1 Department 24-hour telephone service reception, 24 hours standby; from the demand side after the repair, to respond within one hour.
2.2 Upon receipt for the repair within 24 hours after arrived at the scene.
2.3 warranty period, in the proper use of circumstances, such as failure, the responsibility for the provision of free parts and repair services. For caused by improper use of the mechanical, electrical and some other fault, is still responsible for the maintenance, but the price charged to the corresponding rewards.
2.4 warranty period, or demand side, caused by improper use of mechanical, electrical and some other fault, still responsible for the maintenance, but the price charged to the corresponding rewards.
Ratio of 2.5 to help users solve problems for the use of all.

Second, training
1, on-site training: equipment installation, and commissioning process, the technical staff, workers operating equipment-site training.
2, for the need to provide for the proportion of machine operation, maintenance manuals.
Third, liability for breach of contract:
1, the responsibility for the breach:
1), if not for the contractual delivery period of more than seven days or more, each for more than one day, according to the amount of aircraft 1 ‰ for breach of contract payments, and so on. Extension of time of delivery over 14 days above, each more than a day by 2 ‰ cost of the contract for breach of contract payments. As a result of demand-side DELAY causes, and not supply-side.

2) for the actual procurement or manufacture of a book does not meet the technical specifications of the terms of the undertaking, Gongfangying prior written report issued by the initiative, with the consent of the consent of the implementation of demand-side and supply-side in the prior need to inform the circumstances, When the demand side, and found that the actual situation for the technical specifications promised by the contents of the book inconsistencies, the need for the right to put forward, according to the actual prices of parts and components for the implementation of three times a chargeback, for it must be unconditional accept and immediately improved. Not visible part of the materials used in the request for the use of the side prior to inform, to take the time to visit the construction site, the use of the field for the identification of the material required for the notification received after the failure in the provisions of can be achieved within the time arrived for the party, nothing to do with the supply-side. If no notice of demand-side, the proction could not be pursued. To be part of rework.
3), if found to have failed to supply-side of this contract and technical specifications by agreement of the type procts, equipment configuration, to provide manufacturers, the demand side the right to ask for the timely replacement. If the components have resulted from the use of mechanical failures and the need to stop proction for the replacement of parts at the same time should be double the price of compensation demand side, if not replaced, according to the prices of procts or components of the compensation of three times the demand side . (Due to the continuous improvement of the procts and parts
4) warranty period, the supply side can not be received in accordance with the agreement, equipment failure notification, the latest within 24 hours of arrival in the demand-side services to the community, each extended by one hour, Gongfangying compensation to the 100 yuan / hour loss, more than 32 hours or more, Gongfangying commitment to the 1000 yuan / hour proction loss.
5) warranty period, if the quality of equipment for the cause in the demand-side cut-off for more than seven days, Gongfangying commitment to the 1000 yuan / day proction losses in the proction more than 14 days, except for the should be required to take 2,000 yuan / day proction loss. Such as the supply-side procts beyond repair major quality defects, the need to return and the right to demand compensation as a direct result loss.
2, the demand side of the liability for breach of contract
1) to the demand side, supply-side issue orders and to pay the purchase price, such as the cancellation of orders ordering procts, has no right to request for the return of money paid.

2) demand side, in order to supply-side issue, if not the contractual period and the amount of payment for the right to defer the delivery date of this contract.
3) Both sides in contract disputes not resolved through consultation, the two sides may apply to the location of people's courts.
4) Technical Agreement signed by the two sides and sealed after the entry into force of this contract at the same time, have the same legal effect.
5) technical service and after-sales service provided for by the services, training and liability for breach of contract implementation, and the contract has the same legal effect.
6) the signing of this contract sealed by the two sides after the entry into force of the two sides Ge two with the same legal effect.

Machine ratio (Automatic Mixing & Pumping Unit)是 在“知道”首页左边点开一个分类问题,再点“高分”。就可以到200分了

热心网友 时间:2022-06-17 09:18

The allocated proportion machine service, training and the violation responsibility one, serve
1 before-sales service:
1.1 help users carry on the preliminary allocated proportion machine design, the shaping;
1.2 basis user's proct request, helps the user to carry on the allocated proportion machine shaping and the correlation auxiliary spare part shaping;
1.3 basis user's proct request, helps the user to have custom-made the correlation working instruction;
2 post-sale service
2.1 post-sale service department 24 hour telephone receptions, 24 hours standbies; After receives the consumer requesting repairs, gives the answer in 1 hour.
2.2 suppliers in receive request repairs in the latter 24 hours to rush the scene.
2.3 natures guarantee in the time, in right use situation, if breaks down, the supplier is responsible free to provide the components and the repair service.If consumer's use not when creates the machinery, the electricity and so on the partial breakdowns, the supplier was still responsible to service, but by preferential price collection corresponding reward.
2.4 natures guarantee outside the time or the consumer use not when creates the machinery, the electricity and so on the partial breakdowns, the supplier was still responsible to service, but by preferential price collection corresponding reward. I
2.5 help user solution allocated proportion machine use all difficult problems. Second, trains 1, scene training: In the equipment setup, the debugging process, to the technical personnel, operates the worker to carry on equipment scene training. 2nd, the supplier provides the allocated proportion machine equipment setup, the debugging process, to the technical personnel, operates the worker to carry on equipment scene training. 2nd, the supplier provides the allocated proportion machine equipment operation, the maintenance maintenance instruction booklet for the consumer. Third, violation responsibility: 1st, supplier's violation responsibility:
1) the supplier like cannot surpass above 7 day according to the contract agreement deadline delivery, then surpasses every time one day, 1 ‰ undertakes the penalty according to this machine amount, by this analogy.When the extension delivery time surpasses above 14 day, then surpasses one day 2 ‰ to undertake the penalty every time according to the contract total price.Because if the consumer reason creates the time limit for a project delay, then has 2) the consumer in issues the order form after the supplier, if cannot according to the contract agreement deadline and the amount payment fund, the supplier is authorized to postpone this contract date of delivery. 3) both sides occur when the contract dispute consults the solution inadequately, both sides may to the locus people's court prosecution. 4) after technical agreement Shu Jing both sides sign and seal also become effective with this contract, have the same legal effect. 5) the technical service and the post-sale service the service, training and the violation responsibility execution which provides according to the supplier, has with the contract same legal effect. 6) this contract signs and seals after both sides becomes effective, both sides hold two respectively, has the same legal effect.

热心网友 时间:2022-06-17 09:18

A service
1 pre-sale services:
1.1 helps users ratio for the front-end design, selection;
1.2 procts according to the user's request, to help users ratio of Selection and related ancillary components Selection;
1.3 procts according to the user's request, to help the user to customize the relevant rules;
2 Service
2.1 Department 24-hour telephone service reception, 24 hours standby; from the demand side after the repair, to respond within one hour.
2.2 Upon receipt for the repair within 24 hours after arrived at the scene.
2.3 warranty period, in the proper use of circumstances, such as failure, the responsibility for the provision of free parts and repair services. For caused by improper use of the mechanical, electrical and some other fault, is still responsible for the maintenance, but the price charged to the corresponding rewards.
2.4 warranty period, or demand side, caused by improper use of mechanical, electrical and some other fault, still responsible for the maintenance, but the price charged to the corresponding rewards.
Ratio of 2.5 to help users solve problems for the use of all.

Second, training
1, on-site training: equipment installation, and commissioning process, the technical staff, workers operating equipment-site training.
2, for the need to provide for the proportion of machine operation, maintenance manuals.
Third, liability for breach of contract:
1, the responsibility for the breach:
1), if not for the contractual delivery period of more than seven days or more, each for more than one day, according to the amount of aircraft 1 ‰ for breach of contract payments, and so on. Extension of time of delivery over 14 days above, each more than a day by 2 ‰ cost of the contract for breach of contract payments. As a result of demand-side DELAY causes, and not supply-side.

2) for the actual procurement or manufacture of a book does not meet the technical specifications of the terms of the undertaking, Gongfangying prior written report issued by the initiative, with the consent of the consent of the implementation of demand-side and supply-side in the prior need to inform the circumstances, When the demand side, and found that the actual situation for the technical specifications promised by the contents of the book inconsistencies, the need for the right to put forward, according to the actual prices of parts and components for the implementation of three times a chargeback, for it must be unconditional accept and immediately improved. Not visible part of the materials used in the request for the use of the side prior to inform, to take the time to visit the construction site, the use of the field for the identification of the material required for the notification received after the failure in the provisions of can be achieved within the time arrived for the party, nothing to do with the supply-side. If no notice of demand-side, the proction could not be pursued. To be part of rework.
3), if found to have failed to supply-side of this contract and technical specifications by agreement of the type procts, equipment configuration, to provide manufacturers, the demand side the right to ask for the timely replacement. If the components have resulted from the use of mechanical failures and the need to stop proction for the replacement of parts at the same time should be double the price of compensation demand side, if not replaced, according to the prices of procts or components of the compensation of three times the demand side . (Due to the continuous improvement of the procts and parts
4) warranty period, the supply side can not be received in accordance with the agreement, equipment failure notification, the latest within 24 hours of arrival in the demand-side services to the community, each extended by one hour, Gongfangying compensation to the 100 yuan / hour loss, more than 32 hours or more, Gongfangying commitment to the 1000 yuan / hour proction loss.
5) warranty period, if the quality of equipment for the cause in the demand-side cut-off for more than seven days, Gongfangying commitment to the 1000 yuan / day proction losses in the proction more than 14 days, except for the should be required to take 2,000 yuan / day proction loss. Such as the supply-side procts beyond repair major quality defects, the need to return and the right to demand compensation as a direct result loss.
2, the demand side of the liability for breach of contract
1) to the demand side, supply-side issue orders and to pay the purchase price, such as the cancellation of orders ordering procts, has no right to request for the return of money paid.

2) demand side, in order to supply-side issue, if not the contractual period and the amount of payment for the right to defer the delivery date of this contract.
3) Both sides in contract disputes not resolved through consultation, the two sides may apply to the location of people's courts.
4) Technical Agreement signed by the two sides and sealed after the entry into force of this contract at the same time, have the same legal effect.
5) technical service and after-sales service provided for by the services, training and liability for breach of contract implementation, and the contract has the same legal effect.
6) the signing of this contract sealed by the two sides after the entry into force of the two sides Ge two with the same legal effect.

Machine ratio (Automatic Mixing & Pumping Unit)

Wanted to 200 points, but the system set up to the 100. So after only used to separate. Necessity, please help out, thank you!
Add: added: machine as I turned the experience, especially the second floor, declined the machine up, please contract format.

热心网友 时间:2022-06-17 09:19

Proportion of services, training and liability for breach of contract
A service
1 pre-sale services:
1.1 helps users ratio for the front-end design, selection;
1.2 procts according to the user's request, to help users ratio of Selection and related ancillary components Selection;
1.3 procts according to the user's request, to help the user to customize the relevant rules;
2 Service
2.1 Department 24-hour telephone service reception, 24 hours standby; from the demand side after the repair, to respond within one hour.
2.2 Upon receipt for the repair within 24 hours after arrived at the scene.
2.3 warranty period, in the proper use of circumstances, such as failure, the responsibility for the provision of free parts and repair services. For caused by improper use of the mechanical, electrical and some other fault, is still responsible for the maintenance, but the price charged to the corresponding rewards.
2.4 warranty period, or demand side, caused by improper use of mechanical, electrical and some other fault, still responsible for the maintenance, but the price charged to the corresponding rewards.
Ratio of 2.5 to help users solve problems for the use of all.

Second, training
1, on-site training: equipment installation, and commissioning process, the technical staff, workers operating equipment-site training.
2, for the need to provide for the proportion of machine operation, maintenance manuals.
Third, liability for breach of contract:
1, the responsibility for the breach:
1), if not for the contractual delivery period of more than seven days or more, each for more than one day, according to the amount of aircraft 1 ‰ for breach of contract payments, and so on. Extension of time of delivery over 14 days above, each more than a day by 2 ‰ cost of the contract for breach of contract payments. As a result of demand-side DELAY causes, and not supply-side.

2) for the actual procurement or manufacture of a book does not meet the technical specifications of the terms of the undertaking, Gongfangying prior written report issued by the initiative, with the consent of the consent of the implementation of demand-side and supply-side in the prior need to inform the circumstances, When the demand side, and found that the actual situation for the technical specifications promised by the contents of the book inconsistencies, the need for the right to put forward, according to the actual prices of parts and components for the implementation of three times a chargeback, for it must be unconditional accept and immediately improved. Not visible part of the materials used in the request for the use of the side prior to inform, to take the time to visit the construction site, the use of the field for the identification of the material required for the notification received after the failure in the provisions of can be achieved within the time arrived for the party, nothing to do with the supply-side. If no notice of demand-side, the proction could not be pursued. To be part of rework.
3), if found to have failed to supply-side of this contract and technical specifications by agreement of the type procts, equipment configuration, to provide manufacturers, the demand side the right to ask for the timely replacement. If the components have resulted from the use of mechanical failures and the need to stop proction for the replacement of parts at the same time should be double the price of compensation demand side, if not replaced, according to the prices of procts or components of the compensation of three times the demand side . (Due to the continuous improvement of the procts and parts
4) warranty period, the supply side can not be received in accordance with the agreement, equipment failure notification, the latest within 24 hours of arrival in the demand-side services to the community, each extended by one hour, Gongfangying compensation to the 100 yuan / hour loss, more than 32 hours or more, Gongfangying commitment to the 1000 yuan / hour proction loss.
5) warranty period, if the quality of equipment for the cause in the demand-side cut-off for more than seven days, Gongfangying commitment to the 1000 yuan / day proction losses in the proction more than 14 days, except for the should be required to take 2,000 yuan / day proction loss. Such as the supply-side procts beyond repair major quality defects, the need to return and the right to demand compensation as a direct result loss.
2, the demand side of the liability for breach of contract
1) to the demand side, supply-side issue orders and to pay the purchase price, such as the cancellation of orders ordering procts, has no right to request for the return of money paid.

2) demand side, in order to supply-side issue, if not the contractual period and the amount of payment for the right to defer the delivery date of this contract.
3) Both sides in contract disputes not resolved through consultation, the two sides may apply to the location of people's courts.
4) Technical Agreement signed by the two sides and sealed after the entry into force of this contract at the same time, have the same legal effect.
5) technical service and after-sales service provided for by the services, training and liability for breach of contract implementation, and the contract has the same legal effect.
6) the signing of this contract sealed by the two sides after the entry into force of the two sides Ge two with the same legal effect.

Machine ratio (Automatic Mixing & Pumping Unit

自己翻译的,质量有保证

声明声明:本网页内容为用户发布,旨在传播知识,不代表本网认同其观点,若有侵权等问题请及时与本网联系,我们将在第一时间删除处理。E-MAIL:11247931@qq.com